← Pack index
Phase 1 · Deliverable 08 of 10

Number-assurance journey

A leadership KPI looks poor, but the real issue is that it cannot yet be defended. The journey shows how the product keeps "untrusted" apart from "bad", traces the cause through lineage, and returns a human-certified number to the leadership view. It uses the same synthetic world as 07 (Entity A1, Plant 02, Line L2).

DRAFT v0.1 · FOR APPROVAL KPI OPS-001 · ENTITY A1 · P07 · SYNTHETIC TOLERANCE: PLACEHOLDER

Fixed facts for this journey (SYNTHETIC)

KPI
OPS-001 Production vs plan · Entity A1 · P07 MTD
Flash value (preliminary)
412.6 kt (SYN)
MIS value
400.0 kt (SYN)
Flash-to-MIS variance
3.1% vs tolerance [PLACEHOLDER]
Reconciliation break
BRK-SYN-0071 · Material
Cause (found in step T6)
Mapping M-SYN-L2 for Line L2 output meter changed D-2 by Administrator role
Corrected value
401.2 kt (SYN)
Roles
Metric Owner (production) · Certifier (finance) · Analyst · Administrator · Assurance Reviewer

Trust journey (Phase 4 prototype path)

Step
Route
Role
What they see
Human decision / action
AI involvement
Trust state
T1
G-01 Portfolio Home (also O-01 drill, E-01)
Core Group Executive
OPS-001 card for Entity A1. Business status: Declining (amber, arrow). Trust: 'Reconciliation break' (grey broken-link icon); the value is set in a muted style and labelled 'Unverified'. The red breach style is not used.
Open KPI detail
—
Reconciliation break
T2
S-03 KPI Detail
Core Group Executive
Expanded card: value, unit, plan, variance, trend, forecast, provenance mix (P06 certified · P07 preliminary), last refresh, last certified (P06), confidence Low (break open).
Review the trust summary
Validation Assistant summary, labelled: 'Flash and MIS disagree beyond tolerance since D-2'
Reconciliation break
T3
S-03 · Definition / Source / Calculation tabs
Core Group Executive
Approved definition v3 (SYN), formula, unit kt, period, source [PRODUCTION SOURCE — PLACEHOLDER], owner role Metric Owner (production), certifier role Certifier (finance), tolerance [PH].
—
—
—
T4
S-03 · Lineage tab
Analyst / Investigator
Source → ingestion → Lake [PH] → transformation (mapping M-SYN-L2) → KPI → leadership views (O-01, G-01, G-02, E-01). The mapping node is flagged 'Changed D-2 · Administrator role · change ref [PH]'.
Open the break
—
—
T5
S-03 · Reconciliation tab
Analyst / Investigator
BRK-SYN-0071: Source-to-Lake reconciled; Lake-to-KPI mismatch on Line L2; affected leadership KPIs listed (GOV-007 +1); age 2 days.
Assign the investigation to self; open the workbench
Explanation Assistant lists the likely cause as 'AI interpretation', separate from facts
Reconciliation break
T6
E-08 KPI Certification Workbench
Analyst → Administrator → Metric Owner
Analyst attaches evidence (mapping diff, meter log extract [PH]) and requests correction. The Administrator applies the approved mapping fix (no certify control is visible to them). The KPI recomputes to 401.2 kt, and the variance is now within tolerance.
Request correction (Analyst) · execute change (Admin) · confirm definition unchanged (Metric Owner)
Validation Assistant re-checks cross-source consistency: 'Within tolerance; L2 meter calibration evidence missing'
Pending certification
T7
E-08 · Certification decision panel
Certifier (finance), not the Metric Owner (D-02)
Options: Certify · Certify with exception · Request correction. Rationale is mandatory. Evidence checklist shows the calibration certificate as outstanding.
Certify with exception: 'L2 meter calibration evidence due D+5 (SYN)'
Cannot certify. The panel shows: 'AI checks are advisory'
Certified with exception
T8
G-01 · O-01 · E-01 (updated)
All lenses with scope
Card trust badge: 'Certified with exception' (shield with an exception mark; tooltip gives the exception text and due date). BRK-SYN-0071 is closed. TRU-009 and TRU-001 update. Audit entry recorded. Assurance Reviewer gets a sample task.
Assurance Reviewer samples (G-08)
—
Certified with exception

Trust-state sequence on the leadership card

The business status on the card (Declining) stays visible throughout, but carries an 'Unverified' qualifier while trust is broken. It is never shown in breach red because of a data issue.

P06 close
Certified
Prior period certified by the Certifier role.
P07 flash
Pending certification
Daily flash shown as preliminary; certification due at close.
D-2 → D0
Reconciliation break
Flash vs MIS beyond tolerance after the mapping change.
D0 + correction
Pending certification
Recomputed value within tolerance; awaiting human decision.
D0 decision
Certified with exception
Exception and due date visible on the card and in KPI detail.

Branches

ID
Branch
Result
TB-1
Certifier chooses 'Request correction'
State stays 'Reconciliation break'; the Analyst gets a task; the leadership card keeps 'Unverified'.
TB-2
Certification overdue
'Pending certification · Overdue [n] d' (grey + clock icon); TRU-006 increments; escalates to Core Group per D-08.
TB-3
Source unavailable
Card value replaced with the last certified value, labelled 'Last certified P06'. Trust 'Stale'. No silent substitution.
TB-4
Value missing
Card shows '—' and 'Missing', with no variance, trend or status colour.
TB-5
Override requested instead of a fix
Override control is visible only to the Certifier in scope (D-17); reason and evidence are mandatory; GOV-002 increments; Assurance review is required.
TB-6
User outside scope opens the KPI link
S-02 Restricted state: no value, name or entity is revealed; request-access action.