Synthetic data · thresholds placeholder · scenario time D0 06:40 (SYN)R-01 · Entity view

KPI Reference · formulas and values

How is each KPI calculated, and what is its value for this lens, scope and period?

Scope Entity A1 (own entity) Period P06 (SYN) Last refresh 06:25 (SYN) Values from data/kpi-model · 170 KPIs · calculated bottom-up (plant → entity → Group) Sources and lineage

Look at

Lens: Entity (your sign-in). Entity A1 and its plants only (C-05). Values are recalculated for the selected scope and month from its own inputs; YTD measures run from April to the selected month.

Filter · which KPIs, lowest level calculated, source of the formula

Focus of this page

147 KPIs · Entity lens · Entity A1 · P06 (2026)

AnswersHow is each KPI calculated, and what is its value here?

Formula and inputs are the same at every level; the value is recalculated from Entity A1's own inputs, never averaged. Inputs show how each one rolls up (Σ = sum of children, lowest = MIN). Highlighted rows were added by the model. Click a KPI ID for what its number is saying, where the problem sits and what moves it; click a value for its full lineage.

KPI
Measure
Definition
Theme
Unit · basis
Formula
Inputs (roll-up)
Value · Entity A1 · P06
vs P05
Shown on
FIN-001
EBITDA YTD
Earnings before interest, tax, depreciation and amortisation since April: core operating profit.
T1
₹ m · Year to date
Sum of monthly EBITDA since April ÷ 1000
ebitda_k (YTD) (Σ)
890.6 ₹ m
▲ 201.4
E-01 · E-11
FIN-002
EBIT YTD
Earnings before interest and tax since April: operating profit after depreciation.
T1
₹ m · Year to date
Sum of monthly EBIT since April ÷ 1000
ebit_k (YTD) (Σ)
610.1 ₹ m
▲ 154.1
E-01 · E-11
FIN-003
Revenue YTD
Revenue earned since April.
T1
₹ m · Year to date
Sum of monthly Revenue since April ÷ 1000
revenue_k (YTD) (Σ)
6,972.3 ₹ m
▲ 1,155.7
E-01 · E-11
FIN-004
Free cash flow YTD
Cash generated by the business after operating costs and capex since April.
T1
₹ m · Year to date
Sum of monthly Free cash flow since April ÷ 1000
fcf_k (YTD) (Σ)
337.6 ₹ m
▲ 94.3
E-01 · E-11
FIN-005
ROCE, annualised
Return on capital employed: annualised operating profit as a share of the capital tied up in the business.
T1
% · Year to date
EBIT since April × 12 ÷ months elapsed ÷ Capital employed × 100
capital_employed_k (Σ), ebit_k (YTD) (Σ)
11.1 %
▲ 1.1
E-01 · E-11
FIN-006
Net debt
Borrowings less cash held; what the business owes net of its cash.
T1
₹ m · Month end
(Gross debt − Cash) ÷ 1000
net_debt_k (Σ)
3,610.0 ₹ m
▼ 38.0
E-05
FIN-008
FCF conversion (FCF ÷ EBITDA)
Share of EBITDA that turned into free cash flow since April.
T1
% · Year to date
Free cash flow since April ÷ EBITDA since April × 100
ebitda_k (YTD) (Σ), fcf_k (YTD) (Σ)
37.9 %
▲ 2.6
E-05
OPS-001
Production vs plan
How much saleable output the plant made against what the production plan called for in the month.
T1
% of plan · Month
Good output ÷ Planned production × 100
planned_production_t (Σ), good_output_t (Σ)
91.3 % of plan
▲ 2.7
E-01 · E-02 · E-05 · E-08 · S-03e · S-12e
OPS-002
Sales vs plan
How much was sold against the sales volume planned for the month.
T1
% of plan · Month
Sales volume ÷ Planned sales volume × 100
sales_t (Σ), planned_sales_t (Σ)
89.2 % of plan
▲ 0.3
E-01 · E-08 · S-12e
OPS-003
Capacity utilization
How much of the installed capacity was turned into good output; shows spare or stretched capacity.
T1
% · Month
Good output ÷ Installed capacity × 100
installed_capacity_t (Σ), good_output_t (Σ)
79.8 %
▲ 3.6
E-02
GOV-001
Ageing certification approvals
KPI certification approvals past their due date.
T2
count · Month end
Certification approvals past due date
cert_approvals_ageing (Σ)
1
flat
E-08
GOV-002
KPI overrides
KPI values manually overridden instead of taken from source.
T2
count · Month end
KPI values overridden
kpi_overrides (Σ)
0
flat
E-08
GOV-003
Recurring data-quality issues
Data-quality issues that keep coming back.
T2
count · Month end
Recurring data-quality issues
dq_issues_recurring (Σ)
1
flat
E-08
GOV-004
Open audit findings
Audit findings not yet closed.
T2
count · Month end
Open audit findings
audit_findings_open (Σ)
2
▼ 1
E-07 · E-08
GOV-005
Overdue assurance actions
Assurance actions past their due date.
T2
count · Month end
Overdue assurance actions
assurance_actions_overdue (Σ)
0
flat
E-08
GOV-006
Repeat findings
Audit findings raised again after being closed before.
T2
count · Month end
Repeat audit findings
repeat_findings (Σ)
0
flat
E-08
GOV-008
Evidence completeness rate
Share of required evidence items that have been provided.
T2
% · Month end
Evidence items complete ÷ Evidence items required × 100
evidence_required (Σ), evidence_complete (Σ)
86.0 %
flat
E-08
GOV-009
Average finding-closure time
Average days taken to close audit findings since April.
T2
days · Year to date
Days taken to close findings since April ÷ Findings closed since April
findings_closed (YTD) (Σ), finding_closure_days (YTD) (Σ)
28.6 days
▲ 0.2
E-08
TRU-001
Certified KPI percentage
Share of reported leadership KPI values that have been certified.
T2
% · Month end
Leadership KPI values certified ÷ Leadership KPI values reported × 100
kpis_leadership (Σ), kpis_certified (Σ)
82.1 %
flat
E-08
TRU-004
Open reconciliation breaks
Reconciliation breaks between systems not yet resolved.
T2
count · Month end
Open reconciliation breaks
recon_breaks_open (Σ)
1
flat
E-08
TRU-006
Overdue certifications
Certifications past their due date.
T2
count · Month end
Certifications overdue
certifications_overdue (Σ)
0
flat
E-08
TRU-008
Source-to-Lake reconciliation rate
Share of records loaded to the data lake that reconcile to the source system.
T2
% · Month
Records reconciled to source ÷ Records loaded × 100
lake_records_loaded (Σ), lake_records_reconciled (Σ)
98.9 %
▼ 0.5
E-08
TRU-009
Flash-to-MIS reconciliation rate
Share of flash-report lines that match the MIS.
T2
% · Month
Flash lines matching MIS ÷ Flash report lines × 100
mis_lines_total (Σ), mis_lines_matched (Σ)
94.3 %
▼ 1.3
E-08
TRU-010
Flash-to-close variance
Gap between flash revenue and closed revenue.
T2
% · Month
|Flash revenue − Closed revenue| ÷ Closed revenue × 100
revenue_k (Σ), flash_revenue_k (Σ)
0.23 %
▼ 0.11
E-08
TRU-011
Largest entity variance against Board numbers
The largest gap, across entities, between Board-pack EBITDA and certified EBITDA.
T2
% · Month
Highest of the entities' |Board-pack EBITDA − Certified EBITDA| ÷ Certified EBITDA × 100
variable_cost_k (Σ), fixed_cost_k (Σ), revenue_k (Σ), overhead_k (Σ), board_ebitda_k (Σ)
0.3 %
flat
E-08
PRD-001
Days to breach (earliest plant)
Forecast days until the first plant misses its production plan.
T3
days · Forecast
Lowest plant forecast of days until its production plan is breached (99 = not expected)
days_to_breach (lowest)
4 days
▼ 6
E-01 · E-04 · S-12e
PRD-002
Probability of production plan miss, next month
Forecast chance that next month's output falls below plan.
T3
% · Next month
Chance that output falls below plan: normal distribution with mean = Forecast good output, spread = √(sum of plant forecast variances)
planned_production_next_t (Σ), forecast_good_next_t (Σ), forecast_good_var_next (Σ)
79.4 %
▲ 6.6
S-12e
PRD-003
Projected EBITDA gap, rest of year
Forecast gap between expected and planned EBITDA for the rest of the year.
T3
₹ m · Forecast
(Forecast EBITDA − Planned EBITDA, rest of year) ÷ 1000
forecast_ebitda_rest_k (Σ), planned_ebitda_rest_k (Σ)
-48.5 ₹ m
▼ 17.6
S-12e
PRD-004
Projected liquidity gap, next 90 days
Forecast cash shortfall over the next 90 days, if any.
T3
₹ m · Next 90 days
Cash + Undrawn facilities + Forecast net cash flow (90 days); 'None' if not negative
cash_k (Σ), undrawn_facilities_k (Σ), forecast_net_cash_flow_90d_k (Σ)
None within 90 d
—
S-12e
PRD-005
Forecast covenant breach
Whether forecast leverage breaches the lenders' covenant limit.
T3
count · Quarter end
Breach forecast if Forecast net debt ÷ Forecast 12-month EBITDA exceeds the covenant limit
forecast_net_debt_k (Σ), forecast_ebitda_ltm_k (Σ)
Not forecast
—
S-12e
PRD-006
Production loss from downtime, next month
Forecast output lost to downtime next month.
T3
kt · Next month
Forecast production lost to downtime next month ÷ 1000
forecast_downtime_loss_next_t (Σ)
22.3 kt
▲ 5.7
S-12e
PRD-008
Projected FCF gap, full year
Forecast gap between full-year free cash flow and plan.
T3
₹ m · Forecast
(FCF YTD + forecast FCF rest of year − FY FCF plan) ÷ 1000
fcf_k (YTD) (Σ), fcf_plan_fy_k (Σ), forecast_fcf_rest_k (Σ)
-101.3 ₹ m
▼ 10.8
E-05 · E-11 · S-12e
PRD-009
ROCE at P12 (forecast)
Forecast return on capital employed at year end (P12).
T3
% · Forecast
(EBIT YTD + forecast EBIT rest of year) ÷ forecast capital employed at P12 × 100
capital_employed_p12_k (Σ), ebit_fcst_rest_k (Σ), ebit_k (YTD) (Σ)
10.5 %
▲ 1.1
E-11 · S-12e
PRD-010
Revenue per FTE YTD
Revenue since April per full-time employee.
T3
₹ m · Year to date
Revenue since April ÷ FTE ÷ 1000
fte (Σ), revenue_k (YTD) (Σ)
5.17 ₹ m
▲ 0.84
E-11
PRD-011
Tonnes per FTE
Good output per full-time employee in the month.
T3
t · Month
Good output ÷ FTE
fte (Σ), good_output_t (Σ)
235 t
▲ 2
E-11
PRD-012
Probability of EBITDA plan miss, full year
Forecast chance that full-year EBITDA misses plan.
T3
% · Forecast
P(FY EBITDA < FY plan), FY EBITDA ~ Normal(EBITDA YTD + forecast rest of year, σ)
ebitda_fy_sigma_k (√Σσ²), ebitda_k (YTD) (Σ), ebitda_plan_fy_k (Σ), forecast_ebitda_rest_k (Σ)
80.4 %
flat
E-11 · S-12e
SIG-001
Unplanned downtime (same measure as REL-003 Unplanned downtime) (= REL-003 Unplanned downtime)
Hours of production lost to stoppages that were not planned.
T3
h · Month
Alias of REL-003: same value
unplanned_downtime_hours (Σ)
120.7 h
▲ 24.5
S-12e
SIG-002
Yield (same measure as PLT-005 Yield) (= PLT-005 Yield)
Share of feed material that comes out as good, saleable output.
T3
% · Month
Alias of PLT-005: same value
good_output_t (Σ), feed_input_t (Σ)
91.5 %
▲ 0.3
E-02 · S-12e
SIG-003
Recovery percentage (same measure as PLT-004 Recovery percentage) (= PLT-004 Recovery percentage)
Share of the valuable content in the feed that the process recovers into product.
T3
% · Month
Alias of PLT-004: same value
feed_contained_t (Σ), recovered_contained_t (Σ)
87.5 %
▲ 0.5
E-02 · S-12e
SIG-004
Collections slippage
Average number of days customers pay later than their agreed payment terms.
T3
days · Month
(Days taken to collect − Agreed payment terms) ÷ Invoices collected (average days late)
invoices_collected (Σ), collection_days (Σ), terms_days (Σ)
1.9 days
▼ 0.3
E-05 · S-12e
SIG-005
Payment delays
Number of customers more than 30 days overdue on payment.
T3
customers · Month end
Customers more than 30 days overdue
customers_overdue (Σ)
2 customers
flat
E-05 · S-12e
SIG-007
Production at risk
Tonnes of planned output threatened by current plant, supply or maintenance issues.
T3
kt · Month
Production at risk
production_at_risk_t (Σ)
30.9 kt
▼ 7.3
E-01 · E-02 · E-05 · S-12e
SIG-008
Critical plant-state alerts
Number of open critical alerts about plant condition.
T3
alerts · Month
Critical plant alerts
critical_plant_alerts (Σ)
5 alerts
▼ 2
E-03 · S-12e
SIG-009
Critical-material shortage risk
Number of critical materials at risk of running short before the next delivery.
T3
materials · Month
Critical materials at risk
critical_material_risks (Σ)
4 materials
▲ 1
E-01 · E-04 · S-12e
SIG-010
Single-source supply risk
Single-source suppliers whose stock cover is shorter than their resupply lead time.
T3
suppliers · Month end
Single-source suppliers with cover below lead time
single_source_elevated (Σ)
1 suppliers
flat
E-01 · E-04 · S-12e
SIG-011
Capex value at risk
Budget value of capex projects flagged as at risk of overrun or delay.
T3
₹ m · Month end
Budget of projects at risk ÷ 1000
capex_at_risk_k (Σ)
20.8 ₹ m
▼ 0.8
E-06 · S-12e
SIG-012
Dispatch delays
Share of customer dispatches that left late.
T3
% late · Month
Delayed dispatches ÷ Dispatches × 100
dispatches_total (Σ), dispatches_delayed (Σ)
10.9 % late
▲ 0.8
E-05 · S-12e
SIG-013
Pricing pressure
How far realised selling prices are running below plan, graded Low, Medium or High.
T3
count · Month
Realised price vs plan: Low if above −1%, Medium down to −3%, High below −3%
price_vs_plan_pct (CALC)
Low (-0.9% vs plan price)
—
S-12e
SIG-014
Commodity-price movement (RM-1 index)
Month-on-month change in the main raw-material price index.
T3
% MoM · Month
RM-1 price index ÷ last month's index − 1, as %
rm1_price_index (same value)
2.1 % MoM
▲ 1.3
S-12e
SIG-015
FX exposure, unhedged (same measure as TRS-001 FX exposure, unhedged) (= TRS-001 FX exposure, unhedged)
Foreign-currency exposure not covered by hedges.
T3
₹ m · Month end
Alias of TRS-001: same value
fx_exposure_k (Σ), fx_hedged_k (Σ)
123.3 ₹ m
▼ 7.9
S-12e
SIG-016
Freight exposure (lanes disrupted)
Number of supply lanes currently flagged as disrupted.
T3
lanes · Month end
Supply lanes with a disruption flag
freight_lanes_disrupted (Σ)
1 lanes
▲ 1
S-12e
SIG-017
Fuel exposure (fuel cost per tonne, MoM)
Month-on-month change in fuel cost per tonne of output.
T3
% MoM · Month
(Fuel cost ÷ good output) ÷ last month's − 1, as %
fuel_cost_k (Σ), good_output_t (Σ)
-27.7 % MoM
▼ 50.4
E-02 · S-12e
SIG-018
Power-cost exposure (power cost per tonne, MoM)
Month-on-month change in power cost per tonne of output.
T3
% MoM · Month
(Power cost ÷ good output) ÷ last month's − 1, as %
good_output_t (Σ), power_cost_k (Σ)
-10.6 % MoM
▼ 32.6
E-02 · S-12e
SIG-019
Regulatory deadlines, next 30 days (same measure as REG-002 Regulatory deadlines, next 30 days) (= REG-002 Regulatory deadlines, next 30 days)
Regulatory deadlines that fall in the next 30 days.
T3
count · Month end
Alias of REG-002: same value
reg_deadlines_30d (Σ)
2
▲ 2
S-12e
SIG-020
Licence expirations, next 12 months (same measure as REG-003 Licence expirations, next 12 months) (= REG-003 Licence expirations, next 12 months)
Licences that expire in the next 12 months.
T3
count · Month end
Alias of REG-003: same value
licences_expiring_12m (Σ)
1
flat
S-12e
SIG-021
Environmental violations
Number of breaches of environmental permits or limits.
T3
count · Month
Environmental violations
env_violations (Σ)
0
flat
E-02 · E-07 · S-12e
CSH-001
Cash position
Cash held at month end.
T4
₹ m · Month end
Cash ÷ 1000
cash_k (Σ)
967.1 ₹ m
▲ 76.6
E-05
CSH-002
Cash released YTD
Cash freed up since April by working-capital and other cash initiatives.
T4
₹ m · Year to date
Sum of cash released since April ÷ 1000
cash_released_k (YTD) (Σ)
4.2 ₹ m
▲ 0.8
E-05
CSH-003
Daily collections
Average cash collected from customers per day in the month.
T4
₹ m/day · Month
Cash collected ÷ Days in month ÷ 1000
collections_k (Σ)
38.6 ₹ m/day
▲ 0.8
E-01 · E-05 · E-08
CSH-004
Cash-conversion cycle
Days between paying suppliers and collecting from customers (DSO + inventory days − DPO). Shorter frees cash.
T4
days · Month end
DSO + Inventory days − DPO
dso_d (CALC), dpo_d (CALC), dio_d (CALC)
52.3 days
▼ 1.1
E-05
CSH-006
Cash-upstream exposure
Cash an entity must send up to the Group that its available cash does not cover.
T4
₹ m · Next 30 days
(Cash due to be upstreamed − Amount covered by available cash) ÷ 1000
upstream_due_k (Σ), upstream_covered_k (Σ)
27.2 ₹ m
▲ 1.6
E-01 · E-05
LIQ-001
Liquidity runway
How many months cash and undrawn facilities would cover fixed costs, overheads and debt service.
T4
months · Month end
(Cash + Undrawn facilities) ÷ (Fixed cost + Overheads + Debt service) per month
fixed_cost_k (Σ), overhead_k (Σ), cash_k (Σ), undrawn_facilities_k (Σ), debt_service_k (Σ)
15.4 months
▲ 1.1
E-05
LIQ-002
Covenant headroom
How far leverage (net debt ÷ annualised EBITDA) sits below the lenders' covenant limit, as a share of the limit.
T4
% · Month end
(Covenant limit − Net debt ÷ Annualised EBITDA) ÷ Covenant limit × 100
net_debt_k (Σ), ebitda_annualised_k (Σ)
18.9 %
▲ 7.2
E-05 · S-12e
LIQ-003
Debt-maturity exposure, next 12 months
Debt that must be repaid or refinanced in the next 12 months.
T4
₹ m · Month end
Debt maturing in next 12 months ÷ 1000
debt_maturing_12m_k (Σ)
486.3 ₹ m
▲ 56.3
E-05
LIQ-004
Financing exposure (floating-rate debt)
Debt on floating interest rates, exposed to rate rises.
T4
₹ m · Month end
Floating-rate debt ÷ 1000
floating_rate_debt_k (Σ)
1,440.7 ₹ m
▲ 6.2
E-05
TRS-001
FX exposure, unhedged
Foreign-currency exposure not covered by hedges.
T4
₹ m · Month end
(Foreign-currency exposure − Amount hedged) ÷ 1000
fx_exposure_k (Σ), fx_hedged_k (Σ)
123.3 ₹ m
▼ 7.9
E-05
TRS-002
Hedging effectiveness
How closely hedge value changes offset the value changes of the items they protect.
T4
% · Month
Change in value of hedges ÷ Change in value of hedged items × 100
hedge_value_change_k (Σ), hedged_item_value_change_k (Σ)
91.6 %
▼ 1.3
E-05
TRS-003
USD share of unhedged FX exposure
Share of the unhedged foreign-currency exposure that is in US dollars.
T4
% · Month end
(USD exposure − USD hedged) ÷ (FX exposure − FX hedged) × 100
fx_exposure_k (Σ), fx_hedged_k (Σ), usd_exposure_k (Σ), usd_hedged_k (Σ)
80.5 %
▲ 11.9
E-05
TRS-004
Hedge cover, next 6 months
Share of forecast foreign-currency flows over the next 6 months already hedged.
T4
% · Next 6 months
Foreign-currency flows hedged ÷ Forecast foreign-currency flows, next 6 months × 100
fx_flows_6m_k (Σ), fx_hedged_6m_k (Σ)
77.9 %
▲ 0.1
E-05
TRS-005
FX sensitivity, 5% USD move
Rupee impact of a 5% move in the US dollar on the unhedged exposure.
T4
₹ m · Month end
5% × (USD exposure − USD hedged) ÷ 1000
usd_exposure_k (Σ), usd_hedged_k (Σ)
5.0 ₹ m
▲ 0.5
E-05
WCP-001
DSO
Days sales outstanding: how many days of revenue are waiting to be collected from customers.
T4
days · Month end
Trade receivables ÷ Revenue × Days in month
dso_d (CALC)
52.0 days
▲ 1.0
E-01 · E-05
WCP-002
DPO
Days payables outstanding: how many days of spend are owed to suppliers.
T4
days · Month end
Trade payables ÷ Variable cost × Days in month
dpo_d (CALC)
40.2 days
▲ 1.8
E-05
WCP-003
Inventory days
How many days of production cost are held as inventory.
T4
days · Month end
Inventory ÷ Variable cost × Days in month
dio_d (CALC)
40.5 days
▼ 0.4
E-05
WCP-004
Net working capital
Cash tied up in operations: receivables plus inventory minus payables.
T4
₹ m · Month end
(Trade receivables + Inventory − Trade payables) ÷ 1000
nwc_k (Σ)
2,012.2 ₹ m
▼ 9.2
E-05
WCP-005
Working-capital movement
Change in net working capital on last month; positive means more cash tied up.
T4
₹ m · Month
(Net working capital − last month's net working capital) ÷ 1000; positive = cash tied up
nwc_change_k (Σ)
-9.2 ₹ m
▼ 38.5
E-05
WCP-006
Working-capital days
Net working capital expressed as days of revenue.
T4
days · Month end
Net working capital ÷ Revenue × Days in month
revenue_k (Σ), nwc_k (Σ)
52.2 days
▼ 0.8
E-05
CST-001
Cost per tonne
Total production cost (variable plus fixed) for each tonne of good output.
T5
₹/t · Month
(Variable cost + Fixed cost) × 1000 ÷ Good output
good_output_t (Σ), variable_cost_k (Σ), fixed_cost_k (Σ)
2,853 ₹/t
▼ 313
E-02 · E-11
CST-002
Variable cost
Costs that move with production volume: raw materials, power, fuel and consumables.
T5
₹ m · Month
Variable cost
variable_cost_k (Σ)
900.1 ₹ m
▼ 85.8
E-02 · E-11
CST-003
Fuel cost
Spend on fuel in the month.
T5
₹ m · Month
Fuel cost
fuel_cost_k (Σ)
218.7 ₹ m
▼ 79.6
E-02
CST-004
Power cost per tonne
Power cost for each tonne of good output.
T5
₹/t · Month
Power cost × 1000 ÷ Good output
good_output_t (Σ), power_cost_k (Σ)
176 ₹/t
▼ 21
E-02
CST-005
Fixed cost YTD
Costs that do not move with volume (staff, rent, fixed maintenance), summed since April.
T5
₹ m · Year to date
Sum of monthly fixed cost since April ÷ 1000
fixed_cost_k (YTD) (Σ)
21.4 ₹ m
▲ 3.8
E-02 · E-11
OPS-005
Capacity utilisation (same measure as OPS-003 Capacity utilization) (= OPS-003 Capacity utilization)
How much of the installed capacity was turned into good output; shows spare or stretched capacity.
T5
% · Month
Good output ÷ Installed capacity × 100
installed_capacity_t (Σ), good_output_t (Σ)
79.8 %
▲ 3.6
E-01
PLT-001
Asset utilization
Share of all calendar hours the equipment was actually running.
T5
% · Month
Run hours ÷ Calendar hours × 100
calendar_hours (Σ), run_hours (Σ)
91.9 %
▲ 1.1
E-02
PLT-002
OEE
Overall equipment effectiveness: good output as a share of what the line could ideally make, combining availability, speed and quality losses.
T5
% · Month
Availability × Performance × Quality = Good output ÷ Ideal output × 100
ideal_output_t (Σ), good_output_t (Σ)
80.2 %
▲ 1.5
E-02
PLT-004
Recovery percentage
Share of the valuable content in the feed that the process recovers into product.
T5
% · Month
Valuable content recovered ÷ Valuable content in feed × 100
feed_contained_t (Σ), recovered_contained_t (Σ)
87.5 %
▲ 0.5
E-02
PLT-005
Yield
Share of feed material that comes out as good, saleable output.
T5
% · Month
Good output ÷ Feed input × 100
good_output_t (Σ), feed_input_t (Σ)
91.5 %
▲ 0.3
E-02
REL-001
MTBF
Mean time between failures: average run hours between breakdowns. Higher means more reliable equipment.
T5
h · Month
Run hours ÷ Breakdowns
run_hours (Σ), failures (Σ)
165 h
▼ 37
E-03
REL-002
Mean Time to Repair
Mean time to repair: average hours to restore equipment after a breakdown.
T5
h · Month
Repair hours ÷ Breakdowns
failures (Σ), repair_hours (Σ)
8.2 h
▲ 0.1
E-03
REL-003
Unplanned downtime
Hours of production lost to stoppages that were not planned.
T5
h · Month
Unplanned downtime
unplanned_downtime_hours (Σ)
121 h
▲ 25
E-03
REL-004
Production loss from downtime
Tonnes of output lost because equipment was down when it should have been running.
T5
kt · Month
Production lost to downtime
prod_loss_downtime_t (Σ)
21.7 kt
▲ 3.6
E-03
REL-005
Preventive-maintenance compliance
Share of scheduled preventive-maintenance jobs completed on time.
T5
% · Month
Preventive maintenance completed ÷ Preventive maintenance scheduled × 100
pm_scheduled (Σ), pm_completed (Σ)
93.4 %
▼ 4.0
E-03
SUP-001
Supplier on-time delivery
Share of purchase-order lines suppliers delivered on time.
T5
% · Month
Purchase-order lines on time ÷ Lines due × 100
po_lines_due (Σ), po_lines_on_time (Σ)
90.4 %
▲ 1.5
E-04
SUP-002
Supplier fill rate
Share of the ordered quantity suppliers actually delivered.
T5
% · Month
Quantity received ÷ Quantity ordered × 100
qty_ordered_t (Σ), qty_received_t (Σ)
97.0 %
▲ 0.1
E-04
SUP-003
Supplier quality-rejection rate
Share of received quantity rejected for quality.
T5
% · Month
Quantity rejected ÷ Quantity received × 100
qty_received_t (Σ), qty_rejected_t (Σ)
0.97 %
▼ 0.62
E-04
SUP-004
Supplier lead-time variance
How much actual supplier lead times exceed planned lead times, as a percentage.
T5
% · Month
(Actual lead time − Planned lead time) ÷ Planned lead time × 100
lead_time_planned_days (Σ), lead_time_actual_days (Σ)
6.9 %
▲ 1.9
E-04
SUP-005
Critical supplier exposure
Number of critical suppliers with no alternative source.
T5
count · Month end
Critical single-source suppliers
single_source_suppliers (Σ)
2
flat
E-04
SUP-006
Contractor slippage
Average days late per contractor milestone due.
T5
days · Month
Contractor days late ÷ Contractor milestones due (average days late per milestone)
contractor_milestones_due (Σ), contractor_days_late (Σ)
2.5 days
▼ 0.5
E-04 · E-06
SUS-001
Water usage
Volume of water drawn for operations in the month.
T5
'000 m³ · Month
Water used
water_m3 (Σ)
741.3 '000 m³
▲ 67.9
E-02 · E-07
SUS-002
Emissions
Greenhouse-gas emissions from operations, in tonnes of CO2 equivalent.
T5
kt CO2e · Month
Emissions
emissions_tco2e (Σ)
219.5 kt CO2e
▲ 3.1
E-02 · E-07
SUS-003
Energy intensity
Energy used for each tonne of good output; lower means more energy-efficient production.
T5
GJ/t · Month
Energy used ÷ Good output
good_output_t (Σ), energy_gj (Σ)
3.61 GJ/t
▲ 0.01
E-02 · E-07
CPX-001
Approved capex budget
Capital-expenditure budget approved for the year.
T6
₹ m · Full year
Approved capex budget ÷ 1000
capex_budget_k (Σ)
1,000.0 ₹ m
flat
E-06
CPX-002
Committed capex
Capex committed through orders and contracts to date.
T6
₹ m · To date
Capex committed to date ÷ 1000
capex_committed_k (Σ)
722.6 ₹ m
▲ 51.1
E-06
CPX-003
Capex actual spend YTD
Capex actually spent since April.
T6
₹ m · Year to date
Sum of capex spent since April ÷ 1000
capex_spend_k (YTD) (Σ)
468.1 ₹ m
▲ 79.2
E-06
CPX-004
Capex physical progress, weighted
Physical completion of capex projects, weighted by each project's budget.
T6
% weighted · To date
Work completed valued at budget ÷ Approved budget × 100 (weights each project by its budget)
capex_budget_k (Σ), capex_earned_value_k (Σ)
59.0 % weighted
▲ 4.2
E-06
PRG-002
Benefits realisation
Share of planned programme benefits actually delivered since April.
T6
% of plan · Year to date
Benefits delivered since April ÷ Benefits planned since April × 100
benefits_planned_k (YTD) (Σ), benefits_delivered_k (YTD) (Σ)
69.3 % of plan
▼ 0.6
E-06
PRG-003
Delayed projects
Number of capex projects running behind schedule.
T6
count · Month end
Capex projects delayed
projects_delayed (Σ)
0
flat
E-06
PRG-004
Capex / transformation progress (same measure as STR-002 Transformation progress) (= STR-002 Transformation progress)
Share of planned transformation milestones completed.
T6
% · To date
Transformation milestones completed ÷ Milestones in plan × 100
milestones_total (Σ), milestones_done (Σ)
53.3 %
▲ 3.3
E-01
PRG-005
Transformation initiative status
Number of transformation initiatives in each status.
T6
count · Month end
Count of transformation initiatives by status
initiatives_on_track (Σ), initiatives_at_risk (Σ), initiatives_delayed (Σ)
5 on track · 2 at risk · 1 delayed
—
E-06
VAL-001
EBITDA benefit YTD
EBITDA improvement delivered by value-creation initiatives since April.
T6
₹ m · Year to date
Sum of EBITDA benefit since April ÷ 1000
ebitda_benefit_k (YTD) (Σ)
6.2 ₹ m
▲ 1.1
E-06
VAL-002
Cash benefit YTD
Cash improvement delivered by value-creation initiatives since April.
T6
₹ m · Year to date
Sum of cash benefit since April ÷ 1000
cash_benefit_k (YTD) (Σ)
2.4 ₹ m
▲ 0.4
E-06
VAL-003
Cost savings delivered YTD
Cost savings delivered by initiatives since April.
T6
₹ m · Year to date
Sum of cost savings since April ÷ 1000
cost_savings_k (YTD) (Σ)
3.9 ₹ m
▲ 0.6
E-06
CMP-005
Regulatory breaches YTD (same measure as REG-010 Regulatory breaches YTD) (= REG-010 Regulatory breaches YTD)
Number of regulatory breaches since April.
T7
count · Year to date
Sum of regulatory breaches since April
reg_breaches (YTD) (Σ)
0
flat
E-01
CON-001
Contracts expiring, next 90 days
Contracts that expire in the next 90 days.
T7
count · Month end
Contracts expiring in next 90 days
contracts_expiring_90d (Σ)
2
flat
E-04 · E-07
CON-002
Contract-compliance rate
Share of active contracts fully meeting their terms.
T7
% · Month end
Contracts fully compliant ÷ Active contracts × 100
contracts_total (Σ), contracts_compliant (Σ)
95.8 %
▲ 1.4
E-04 · E-07
CON-003
Supplier EHS non-compliance
Suppliers not meeting EHS requirements.
T7
count · Month end
Suppliers not meeting EHS requirements
supplier_ehs_noncompliance (Σ)
0
flat
E-04 · E-07
CTL-002
Control failures YTD
Internal-control tests that failed since April.
T7
count · Year to date
Sum of control failures since April
control_failures (YTD) (Σ)
2
flat
E-07
CTL-005
Policy exceptions YTD
Approved departures from policy since April.
T7
count · Year to date
Sum of policy exceptions since April
policy_exceptions (YTD) (Σ)
2
▲ 1
E-07
CTL-006
Unauthorised-vendor usage YTD
Purchases from vendors not on the approved list since April.
T7
count · Year to date
Sum of unauthorised vendor uses since April
unauthorized_vendor_uses (YTD) (Σ)
0
flat
E-07
CTL-007
Segregation-of-duties exceptions YTD
Cases since April where one person held duties that should be split.
T7
count · Year to date
Sum of segregation-of-duties exceptions since April
sod_exceptions (YTD) (Σ)
0
flat
E-07
CTL-008
Unauthorised-access events YTD
Access to systems or data by people not authorised, since April.
T7
count · Year to date
Sum of unauthorised access events since April
unauthorized_access_events (YTD) (Σ)
0
flat
E-07
CTL-009
Data-sharing exceptions YTD
Data shared outside agreed rules since April.
T7
count · Year to date
Sum of data-sharing exceptions since April
data_sharing_exceptions (YTD) (Σ)
0
flat
E-07
CTL-010
Manual overrides YTD
Manual overrides of operational or system controls since April.
T7
count · Year to date
Sum of manual operational or system overrides since April
manual_overrides (YTD) (Σ)
7
▲ 1
E-07
EHS-001
TRIR
Total recordable injury rate: recordable injuries per 200,000 hours worked (about 100 people for a year).
T7
per 200k h · Month
Recordable injuries × 200,000 ÷ Hours worked
hours_worked (Σ), recordable_injuries (Σ)
0.91 per 200k h
▼ 1.16
E-07
EHS-002
Severity incidents
Number of incidents classed as high severity.
T7
count · Month
Severity incidents
severity_incidents (Σ)
1
flat
E-07
EHS-003
Near misses
Events that could have caused harm but did not; a leading indicator of safety risk.
T7
count · Month
Near misses
near_misses (Σ)
20
▲ 1
E-07
EHS-004
Critical safety incidents
Number of incidents classed as critical to safety.
T7
count · Month
Critical safety incidents
critical_safety_incidents (Σ)
0
▼ 1
E-07
EHS-005
Environmental excursions
Number of times environmental limits were exceeded.
T7
count · Month
Environmental excursions
env_excursions (Σ)
1
▲ 1
E-02 · E-07 · S-12e
EHS-006
Open EHS corrective actions
EHS corrective actions raised and not yet closed.
T7
count · Month
Open EHS corrective actions
ehs_ca_open (Σ)
28
▲ 10
E-07
EHS-007
Overdue EHS actions
EHS corrective actions past their due date.
T7
count · Month
Overdue EHS corrective actions
ehs_ca_overdue (Σ)
7
▲ 6
E-07 · S-12e
EHS-008
EHS escalation clocks running
Number of EHS escalation deadlines currently counting down.
T7
count · Month end
EHS escalation clocks running
ehs_escalation_clocks (Σ)
0
flat
E-07
EHS-009
EHS investigation completion
Share of EHS investigations due this month that were completed.
T7
% · Month
EHS investigations completed ÷ EHS investigations due × 100 (100 if none due)
investigations_due (Σ), investigations_completed (Σ)
75 %
▲ 8
E-07
REG-001
Pending filings
Regulatory filings due and not yet submitted.
T7
count · Month end
Regulatory filings pending
pending_filings (Σ)
0
flat
E-07
REG-002
Regulatory deadlines, next 30 days
Regulatory deadlines that fall in the next 30 days.
T7
count · Month end
Regulatory deadlines in next 30 days
reg_deadlines_30d (Σ)
2
▲ 2
E-07
REG-003
Licence expirations, next 12 months
Licences that expire in the next 12 months.
T7
count · Month end
Licences expiring in next 12 months
licences_expiring_12m (Σ)
1
flat
E-07
REG-004
Regulatory obligations due, next 30 days
Regulatory obligations that fall due in the next 30 days.
T7
count · Month end
Regulatory obligations due in next 30 days
reg_obligations_due_30d (Σ)
1
▼ 1
E-07
REG-005
Overdue regulatory obligations
Regulatory obligations already past their due date.
T7
count · Month end
Regulatory obligations overdue
reg_obligations_overdue (Σ)
0
flat
E-07
REG-006
Licence or permit expiry clock
Days until the earliest licence or permit expires at any plant.
T7
days · Month
Days to permit expiry (lowest plant)
permit_days_to_expiry (lowest)
65 days
▼ 30
E-07 · S-12e
REG-007
Open regulatory actions
Actions required by regulators that are still open.
T7
count · Month end
Open regulatory actions
reg_actions_open (Σ)
0
flat
E-07
REG-008
Overdue compliance actions
Compliance actions past their due date.
T7
count · Month end
Overdue compliance actions
compliance_actions_overdue (Σ)
0
flat
E-07
REG-010
Regulatory breaches YTD
Number of regulatory breaches since April.
T7
count · Year to date
Sum of regulatory breaches since April
reg_breaches (YTD) (Σ)
0
flat
E-07
REG-011
Disclosure clock, hours remaining
Hours left before the nearest open disclosure deadline.
T7
h remaining · Month end
Hours to the nearest open disclosure deadline (999 = none running)
disclosure_deadline_h (lowest)
38 h remaining
▼ 961
E-07
EFF-002
Open critical alerts
Critical alerts not yet resolved.
T8
count · Month end
Open critical alerts
critical_alerts_open (Σ)
1
flat
E-01 · E-09
EFF-007
Overdue actions
Actions past their due date.
T8
count · Month end
Overdue actions
actions_overdue (Σ)
0
flat
E-01 · E-09
EFF-008
Average resolution time
Average days from raising an alert to resolving it.
T8
days · Month
Days taken to resolve alerts ÷ Alerts resolved
alerts_resolved (Σ), alert_resolution_days (Σ)
2.8 days
▼ 0.3
E-09
EFF-009
Closed escalations, last 30 days
Escalations closed in the last 30 days.
T8
count · Month
Escalations closed in the month
escalations_closed (Σ)
3
flat
E-09
EFF-010
Repeat issues, last 90 days
Issues that recurred in the last 90 days.
T8
count · Last 3 months
Sum of repeat issues over the last 3 months
repeat_issues (Σ)
3
flat
E-09
EFF-011
Root causes eliminated YTD
Root causes eliminated since April, against those identified.
T8
count · Year to date
Root causes eliminated since April, of those identified since April
root_causes_identified (YTD) (Σ), root_causes_eliminated (YTD) (Σ)
4 of 4
—
E-09