Synthetic data · thresholds placeholder · scenario time D0 06:40 (SYN)S-04 · Entity view
Alert Detail · ALT-SYN-2041
What happened, how material is it, and who owns it?
Scope Entity A1 (own entity)
Period P07 MTD (SYN)
Last refresh 06:25 (SYN)
Label FORECAST · confidence Medium · facts separated in S-07
Sources and lineage
Focus of this page
Alert header (22-field model, 11a)
Alert ID
ALT-SYN-2041
Title
Production shortfall · Plant 02 · reliability losses + RM-1 cover
State
Owned · war room active
Severity
High (rule-assigned)
Materiality
Critical (PH model)
Detected
D-1 22:05
Source type
Supplier signal [PH]
Label
FORECAST
Affected scope
Business A › Entity A1 › Plant 02
Confidence
Medium (inventory preliminary)
Linked KPIs
OPS-001 · SIG-009 · SIG-007 · CSH-006
Named owner
Entity Executive · accepted D-1 23:15
Due
Decision D0 11:00
Escalation clock
L2 · next level in [PH] h
Evidence
6 of 9 items
Closure criteria
4 defined (see E-10)
Impact · current vs forecast
Dimension
Current
Forecast
Production
−26.2 kt vs plan (P06 CERT · 78.4%)
−24.3 kt from D+4
Dispatch
16% late (P06)
2–4 d delay
Billing
0
₹31 m deferred
Cash
0
₹27.2 m upstream exposure
Financial
0
−₹56.2 m EBITDA P07–P12
EHS · Regulatory · Quality
None
None
Materiality drivers · dimension ratings (placeholder scoring)
AnswersWhy is this alert rated Critical?
Result Critical: two High dimensions plus a time-to-breach modifier (≤ [PH] days). Thresholds are placeholders (D-03).
Production exposure
High
Liquidity / cash
High
Financial
Medium
Regulatory
Low
Reputation
Low
EHS
None
Recommended actions (AI drafts accepted by a human)
Action
Drafted by
Accepted by
ACT-SYN-1107 Qualify S-12
Escalation Routing Assistant
Entity Executive
ACT-SYN-1108 Expedite logistics
Functional Leader (supply)
Entity Executive
ACT-SYN-1109 Re-sequence L2
Functional Leader (production)
Entity Executive
Decision required
HUMAN DECISION REQUIREDDEC-SYN-0219: alternate sourcing above [DoA LIMIT — PH]. Authority: Owner. Due 11:00.
O-06 →
Updates and audit
Time (SYN)
Update
By (role)
D-1 22:05
Detected
System
D-1 22:30
Routing drafted (owner role, due, path)
Escalation Routing Assistant
D-1 23:15
Ownership accepted
Entity Executive
D0 05:10
Materiality → Critical
Rule
Entity A1 by plant · P06 · Sep 2026 (SYN, certified month)
AnswersWhich plant is driving each entity number?
Parent values (Σ) are recalculated from their children's summed inputs, never averaged. Click any value for its calculation.
KPI
Measure
Plant 01 (P01)
Plant 02 (P02)
Plant 03 (P03)
Entity A1 · Σ
Unit
How rolled up
OPS-001
Production vs plan
96.0
78.4
99.5
91.3
% of plan
Recomputed from summed inputs
My actions
Ownership was accepted by you on D-1 23:15; reassignment is a Core Group action.