Control Tower
OwnerSign out
Ask
Tour ▾
Primary business journey
Owner · 10 steps · alert to closure
Data Assurance journey
Core Group · 8 steps · break to certification
Synthetic data · thresholds placeholder · scenario time D0 06:40 (SYN)O-09

Operations Command View

Are the businesses producing what they should, reliably and at the right cost?

Scope Group · all businesses Period P07 MTD (SYN) Last refresh 06:25 (SYN) All values from the governed KPI model · Sep 2026 (certified month) Sources and lineage

Production

Production vs plan · GroupiProduction (role)
80859095100 Target 100 95.5% of plan
On targetNear targetOff targetTargetNeedle = current value
Trend▲ 3.4% vs Aug (+3.2 % of plan)
Plan≥ 100.0% · var −4.5 pts
ActualTarget
▲ IncreasingHigh riskIntervention required

Production vs plan 95.5% of plan against a ≥100.0% target; Entity A1 at 91.3% of plan drives the gap.

Reliability

MTBF · Groupi
100150200250300 Target 200 270h
On targetNear targetOff targetTargetNeedle = current value
Trend▲ 27.4% vs Aug (+58 h)
Plan≥ 200 h · var +70 h
ActualTarget
▲ IncreasingLow riskOn track

MTBF 270 h against a ≥200 h target; Entity A1 at 165 h misses it.

Cost efficiency

Cost per tonne · GroupiFinance (role)
2,6002,8003,0003,2003,400 Target 2,900 2,934₹/t
On targetNear targetOff targetTargetNeedle = current value
Trend▼ 7.3% vs Aug (−231 ₹/t)
Plan≤ 2,900 ₹/t · var +34 ₹/t
ActualTarget
▼ DecreasingHigh riskIntervention required

Cost per tonne 2,934 ₹/t against a ≤2,900 ₹/t target; Entity A2 at 3,017 ₹/t drives the gap.

Anomaly heat map · operating measures by area and risk level

AnswersWhere are the operating problems, and how serious are they?

Each cell counts the measures (per entity) in that area at that risk level, from the model status: Intervention required = High, Declining = Medium, On track or Improving = Low. Select a cell to list them.

Category / risk level
Low
Medium
High
Total
Production
6
Reliability
8
Cost
6
Supply
4
Total
11
7
6
24

Select a cell to list its signals here.

Production vs plani

▼ Decreasing since Apr
Entity A1 (% of plan)Entity A2 (% of plan)Plan 100%
AprMayJunJulAugSep

Entity A1 was below plan in every month (91.3% in Sep). Entity A2 met plan in Apr and Sep (100.3% in Sep).

Reliability trend · mean time to repairi

▲ Increasing since Apr
Entity A1 (h)Entity A2 (h)Target ≤ 6 h
AprMayJunJulAugSep

Repair time in Entity A1 rose every month, from 5.3 h in Apr to 8.2 h in Sep. Entity A2 is 6.2 h; both are above the 6 h target.

Sustainability curve · emissionsi

▼ Decreasing since Apr
Entity A1 (kt CO2e)Entity A2 (kt CO2e)
AprMayJunJulAugSep

Group emissions rose three months running, from 374.1 kt CO2e in Jun to 427.7 in Sep (+17.3 vs Aug).