Supply and Contractor Dependencies

Which suppliers or contractors could stop production?

Scope Entity A1 (own entity) Period P07 MTD (SYN) Last refresh 06:25 (SYN) 4 of 6 cards certified · SUP-004 pending certification · SUP-005 pending certification Sources and lineage
Supplier on-time deliverySUP-001
90.4%
Intervention required

Supplier on-time delivery: 90.4% against a ≥95% target (−4.6 pts); Plant 02 (85.0%) accounts for 2.8 of the 4.6 pts gap.

By plant · SepEffect on entity
Plant 0192.7%▲ 0.4−0.6 pts
Plant 0285.0%▲ 1.5−2.8 pts
Plant 0392.4%▲ 2.5−1.2 pts

Root cause: Plant 02 received 147 of 173 order lines on time (85.0%). The main cause is Supplier S-07 (single source of RM-1, 62% on time, delivery slipped 6 days).

Plan≥ 95.0% · var −4.6 pts Trend▲ 1.5 vs P05 Forecast—
P01P06
Actual · P01–P06Plan
CERT P06
Refreshed 06:25Owner Supply (role)
Supplier fill rateSUP-002
97.0%
Intervention required

Supplier fill rate: 97.0% against a ≥98% target (−1.0 pts); Plant 01 (96.1%) accounts for 0.5 of the 1.0 pts gap.

By plant · SepEffect on entity
Plant 0196.1%▼ 0.6−0.5 pts
Plant 0297.4%▲ 0.4−0.2 pts
Plant 0397.3%▲ 0.3−0.3 pts

Root cause: All three plants are below the ≥98% target; Plant 01 is lowest at 96.1%. There is no single supplier cause in the model.

Plan≥ 98.0% · var −1.0 pts Trend▲ 0.1 vs P05 Forecast—
P01P06
Actual · P01–P06Plan
CERT P06
Refreshed 06:25Owner Supply (role)
Quality-rejection rateSUP-003
0.97%
On track

Quality-rejection rate: 0.97% against a ≤1.50% target (−0.53 pts); all three plants meet target.

By plant · SepEffect on entity
Plant 011.40%▲ 0.12−0.03 pts
Plant 021.11%▼ 0.55−0.12 pts
Plant 030.62%▼ 1.13−0.38 pts
Plan≤ 1.50% · var −0.53 pts Trend▼ 0.62 vs P05 Forecast—
P01P06
Actual · P01–P06Plan
CERT P06
Refreshed 06:25Owner Quality (role)
Supplier lead-time varianceSUP-004
6.9%
Declining Pending certification

Supplier lead-time variance: 6.9% against a ≤5% target (+1.9 pts); Plant 02 (17.3%) moves it +3.2 pts, partly offset by Plant 03.

By plant · SepEffect on entity
Plant 015.0%▲ 6.50.0 pts
Plant 0217.3%▼ 1.4+3.2 pts
Plant 032.4%▼ 0.7−1.3 pts

Root cause: Plant 02 lead times ran 17.3% over plan (772 vs 658 supplier-days), driven by Supplier S-07 (single source of RM-1, 62% on time, delivery slipped 6 days).

Plan≤ 5.0% · var +1.9 pts Trend▲ 1.9 vs P05 Forecast—
P01P06
Actual · P01–P06Plan
PRELIM
Refreshed 06:25Owner Supply (role)
Critical supplier exposureSUP-005
2
On track Pending certification

Critical supplier exposure: 2; unchanged since Apr.

Entity-level measure; the model holds no plant split. Plant link: RM-1 (Supplier S-07) feeds Plant 02; RM-3 (Supplier S-04).

Plan— · var — Trendflat Forecast—
P01P06
Actual · P01–P06Plan
PRELIM
Refreshed 06:25Owner Supply (role)
Contractor slippageSUP-006
2.5days
Intervention required

Contractor slippage: 2.5 days against a ≤0.0 days target (+2.5 days).

Entity-level measure; the model holds no plant split. Plant link: Project 05 · Contractor C-3.

Root cause: Contractor C-3 is 3 days late on M3 civil works for Project 05 (debottleneck).

Plan≤ 0.0 days · var +2.5 days Trend▼ 0.5 vs P05 Forecast—
P01P06
Actual · P01–P06Plan
CERT P06
Refreshed 06:25Owner Projects (role)
Focus of this page

Material cover minus replenishment lead time · days (negative = stock-out risk)

AnswersWhich materials will run out before they can be replenished?

RM-1 · S-07 (single source)
3.5 d vs 9 d
RM-4 · S-02
11 d vs 7 d
RM-2 · S-11
12 d vs 7 d
RM-3 · S-04 (single source)
21 d vs 10 d

Critical suppliers

Supplier
Material
OTD
Single source
Status
Owner (role)
Supplier S-07 (SYN)
RM-1
62%
Yes
Delivery slipped 6 d
Functional Leader (supply)
Supplier S-04 (SYN)
RM-3
97%
Yes
On time
Functional Leader (supply)
Supplier S-12 (SYN)
RM-1 (alternate)
—
—
Qualification pending
Quality (role)

Leading signals

SIG-009 Critical-material shortage risk
4 materials
LEADING · cover 3.5 d
SIG-010 Single-source supply risk
1 suppliers
LEADING
PRD-001 Days to breach
4 days
PREDICTION

Supply alert

Critical FORECAST War room active ALT-SYN-2041 · INC-SYN-0142
Production shortfall · Plant 02 · reliability losses + RM-1 cover
Severity
High (rule-assigned)
Materiality
Critical · drivers Production, Liquidity (PH model)
Exposure
−24.3 kt · −₹56.2 m EBITDA · ₹27.2 m upstream (FCST)
Named owner (role)
Entity Executive · Entity A1 · accepted D-1 23:15
Due
Decision D0 11:00
Escalation clock
L2 Core Group · next level in [PH] h
Evidence
6 of 9 items
Next action
Prepare options for DEC-SYN-0219 (Owner)
Open case CASE-SYN-0388

Named actions

Issue
Severity
Exposure
Named owner (role)
Due
Status
Escalation
Next action
High
Recovers 14.0 kt
Functional Leader (supply)
D+2
Awaiting decision
L0
Start on DEC-SYN-0219
High
Brings 2 d forward
Functional Leader (supply)
D+1
Open
L0
Book freight